Primary Care Centres

Primary Care Centres 2018-08-16T17:36:00+01:00

Project Description

14 Primary Care Centres

The PPP Project was launched to build 14 Primary Care Centres around Ireland as part of the government’s investment in Infrastructure Stimulus Package

Shanahan Power Ltd was chosen by 10 different Electrical Contractors across Ireland and installed our SIEL UPS package in all 14 Primary Care Centres. The package consisted of 2no 10kVA UPS in parallel for N+1 Redundancy. Each UPS had 20min Back-up Time and a Volt Free Relay Card to communicate with the BMS. Each System also had a Wrap Around External Bypass Panel so as 1no UPS can be taken offline at a time for maintenance going forward

  • 2no 10kVA UPS per Site

  • N+1 Redundancy 

  • External Wrap Around Bypass Panel

  • 20min Back-up Time per UPS